We had an earlier than normal departure from Salthouse Dock yesterday as we had to be through Albert Dock before 8:15 as the tidal barrier had to be raised at 8:15 as there was a high tide. We were first in the convoy and into Mann Island Lock, we then retraced our route through the docks and through 'Sid's Ditch' (one of the BW lads, Sid, who helped us through the locks and bridges, played a large part, with his colleagues in the excavation of the channel through the docks. Again the BW team were excellent and went beyond the call of duty helping us through further swing bridges in Maghull. We moored for the evening at Halsall, where apparently they started building the Leeds Liverpool Canal.
We haven't moved today due to the weather, its been blowing a gale and throwing it down all day. We will have a long day tomorrow as we have agreed to share the Wigan flight with another boat on Tuesday morning.
Our Mooring in Salthouse Dock
Leaving Salthouse into Albert Dock
Looking back to the Liver Buildings
Resourceful Moorhen
Our BW 'out crew'
John & Brian
Sue & Ali
Halsall Bridge Moorings
(this was empty when we went down!)
20 miles 6 locks 9 swing bridges
Fellow bloggers Indigo Dreaming have been part of the Jubilee River Pageant, see http://indigodream.wordpress.com/ for their latest update.
No comments:
Post a Comment
Thank you for your comments